Access to some of the readings are available through Course Reserve MSSE5344
Module 2: IVV – Definition
Verification, Validation, and Testing of Engineered System
- Chapter 2 - Sections 2.1 and 2.2 - VVT activities during Definition
- Chapter 4 - Section 4.2.1 to 4.2.4 VVT Products Preparation
INCOSE Handbook Introduction
- Section 3.3.1 and 3.3.2: Life Cycle Stages Concept and Development
- Section 4.2 and 4.3: Stakeholder Needs and Systems Requirements Definition Processes
CMMI Model
- Requirements Development Process Area - Specific Goal 3 Analyze and Validation Requirements (334-340)
- Verification Process Area - Specific Goal 1 Prepare for Verification
- Verification Process Area - Specific Goal 1 Prepare for Validation
Module 3: IVV – Design
Verification, Validation, and Testing of Engineered System
- Chapter 2 – Section 2.3 VVT activities during Design
- Chapter 4 – Section 4.3 Perform non-testing VVT activities
- Chapter 6 – Section 6.2 Cost and Risk Modeling
INCOSE Handbook Introduction
- Section 3.3.2: Development Stage
- Section 4.5: Design Definition Process
- Section 5.4: Risk Management Process
CMMI Model
- Technical Solution Process Area - Specific Goal 2 Develop the Design (Pages 380-383)
- Risk Management Process Area - Specific Goal 2 Identify and Analyze Risks
Module 4: IVV – Implementation
Verification, Validation and Testing of Engineered System
- Chapter 2 – Section 2.4 VVT activities during Implementation
- Select Chapter 5 concepts (dependent on class project)
INCOSE Handbook Introduction
- Section 4.7: Implementation Process
- Select Chapter 10 Concepts: Specialty Engineering Activities (dependent on class project)
CMMI Handbook
- Supplier Agreement Management Process Area - Specific Goal 2 Satisfy Supplier Agreements (Pages 369-372)
- Technical Solution Process Area - Specific Goal 3 Implement the Product Design (Pages 387-391)
Module 5: IVV – Integration
Verification, Validation, and Testing of Engineered Systems
- Chapter 2 - Section 2.5 VVT activities during Integration
- Chapter 5 - Section 5.7.5 Integration Testing
INCOSE Handbook Introduction
- Section 4.8: Integration Process Area
- Select Chapter 10 concepts (dependent on class project)
CMMI Model
- Product Integration Process Area
Module 6: IVV – Qualification and Acceptance
Verification, Validation, and Testing of Engineered Systems
- Chapter 2 - Section 2.6 VVT activities during Qualification
- Select Chapter 5 concepts (dependent on class project)
INCOSE Handbook Introduction
- Verification and Validation Process Elaboration (4.9.2 and 4.11.2)
- Select Chapter 10 concepts (dependent on class project)
CMMI Model
- Verification Process Area - Specific Goal 2 and 3 Verify work product and conduct peer reviews
- Validation Process Area - Specific Goal 2 Validate product
Module 7: IVV – Quality Metrics Calculations and Analysis
Verification, Validation and Testing of Engineered Systems
- Chapter 3 - Post Development Systems VVT activities
- Chapter 7 - Section 7.2 Quality Data Acquisition and Aggregation
INCOSE Handbook
- Section 4.12 to 4.14 Operation to Disposal Process
- Section 5.8 Quality Assurance Process
CMMI Model
- Process and Product Quality Assurance Process Area - Specific Goal 1 - Objectively Evaluate Processes and Work Products
- Risk Management Process Area - Specific Goal 3 - Mitigate Risks