Module 1: Systems and Software Engineering Lifecycle Processes (Access Available under Course Reserve MSSE 5347)
INCOSE Systems Engineering Handbook V4: Table of Content, Preface, and SE Handbook Scope
- Section 1.3: Contents
- Section 2.3: The hierarchy within system
- Section 3.1: Introduction
- Section 3.2: Lifecycle characteristics
- Section 3.3: Lifecycle stages
- Section 3.4: Lifecycle approaches
- Section 3.5: What is best for your organization, project or team
- Chapter 5: Technical management processes
- Chapter 6: Agreement processes
- Chapter 7: Organizational project-enabling processes
PSP: a self-improvement process for software engineers
- Chapter 14: Using the Personal Software Process
Scrum guide
- If a link does not work or the file has been removed from any of the sites referenced above, you may access the file in the library secure site Course Reserve MSSE 5347. You must log in with your UTEP credentials to access Course Reserve materials.
Module 2: ISO 15288 Technical Processes and CMMI Process Areas Categories
ISO/IEC/IEEE 15288: 2015
CMMI for Development, Version 1.3
- Part 1 Section 4, “Relationships Among Process Areas,” pg. 39 – 54
CMMI for Development Quick Reference Guide
- Read the five Engineering Process Areas: Requirements development, Technical Solution, Product Integration, Verification, and Validation
INCOSE Systems Engineering Handbook V4
- Section 3, “Generic Life Cycle Stages,” pg. 25 – 32
- Section 4, “Technical Processes,” pg. 47 – 101
- If a link does not work or the file has been removed from any of the sites referenced above, you may access the file in the library secure site Course Reserve MSSE 5347. You must log in with your UTEP credentials to access Course Reserve materials.
Module 3: Managing Organizational Changes (Access Available under Course Reserve MSSE 5347)
Managing Organizational Change: An Integrative Perspective
- Note that you have to log in with your UTEP credentials to access this article
CMMI for Development, Version 1.3
- Part 2, Organizational Process Focus, pg.203-216
INCOSE Systems Engineering Handbook V4
- Section 7 (7.1-7.6), Organizational Project-Enabling Processes, pg.145-158
IDEAL
- Chapter 1 The Initiating Phase, pg.11-17
- Chapter 2 The Diagnosing Phase, pg.53-59
- Chapter 3 The Establishing Phase, pg.67-72
- Chapter 4 The Acting Phase, pg.93-100
- Chapter 5 The Leveraging Phase, pg.127-131
- If a link does not work or the file has been removed from any of the sites referenced above, you may access the file in the library secure reserve site Course Reserve MSSE 5347. You must log in with your UTEP credentials to access Course Reserve materials.
Module 4: Process Improvement Infrastructure (PII) (Access Available under Course Reserve MSSE 5347)
CMMI for Development, Version 1.3
- Process area OPD, Organizational Process Definition
- OPF; Organizational Process Focus; Section: Introduction
INCOSE Systems Engineering Handbook V4
- Section 7 (7.1) Life cycle Model Management Process
- Section 7 (7.2) Infrastructure Management Process
- Section 7 (7.5) Quality Management Processes
- If a link does not working or the file has been removed from any of the sites referenced above, you may access the file in the library secure reserve site Course Reserve MSSE 5347. You must log in with your UTEP credentials to access Course Reserve materials.
Module 5: Managing Process Improvement (Access available under Course Reserve MSSE 5347)
Team Software Process Body of Knowledge (TSP BOK) Knowledge areas 2.3, 2.4 and 2.5
CMMI for Development, Version 1.3
- Organizational Process Definition (OPD) process area
- Generic Goals and Generic Practices; pg: 65-68
- GP 2.4 Assign Responsibility, pg. 82
CMMI for Development Quick Reference Guide
INCOSE Systems Engineering Handbook V4
- Section 7 (7.4) Human Resource Management Process
The Skilled Facilitator (book) PLEASE DO NOT DOWNLOAD THE E-BOOK
IDEAL : A User’s Guide for Software Process Improvement
- Section 1.6, Establish Software Process Improvement Infrastructure
- Sections 1.6.1, 1.6.2, 1.6.3
- Section 4.3, Pilot Potential Solutions, pg. 107
- Section 4.6, Develop Rollout Strategy and Plan Template, pg. 111
- Section 4.9 Rollout the Solution
- If a link does not working or the file has been removed from any of the sites referenced above, you may access the file in the library secure reserve site Course Reserve MSSE 5347. You must log in with your UTEP Credentials to access Course Reserve materials.
Module 6: Managing Process Adherence (Access available under Course Reserve MSSE 5347)
CMMI for Development, Version 1.3 read process areas:
- PPQA, “Process and Product Quality Assurance”
- MA, “Measurement and Analysis"
INCOSE Systems Engineering Handbook V4
- Section 5.8: Quality Assurance Process
- If a link does not working or the file has been removed from any of the sites referenced above, you may access the file in the library secure reserve site Course Reserve MSSE 5347. You must log in with your UTEP credentials to access Course Reserve materials.
Module 7: Managing Statistical Process Control (Access available under Course Reserve MSSE 5347)
CMMI for Development, Version 1.3 read process areas:
- Organizational Process Performance (OPP) and Quantitative Project Management (QPM)
Software Engineering Institute, High Maturity! How Do We Know?
- Statistical Thinking ML 4, OPP, and QPM (slides 1-54)
- If a link does not working or the file has been removed from any of the sites referenced above, you may access the file in the library secure reserve site Course Reserve MSSE 5347. You must log in with your UTEP credentials to access Course Reserve materials.